“What Pressure Do I Pre-charge My Hydropneumatic Tank To?”

 In our last blog we talked about how to properly size a hydropneumatic tank – but the engineer’s work doesn’t end there.  He or she also needs to specify the appropriate pre-charge on the drawings.  Otherwise the tank will not be set properly at start-up and will not provide the intended energy savings.
Read More

How To Size A Hydropneumatic Tank in A Pressure Booster System

 Properly sized hydropneumatic tanks are a non-negotiable element in a domestic water pressure booster system--including variable speed systems.  Without a hydropneumatic tank, pumps will short cycle on and off during no flow periods.  Even a leaky faucet can cause pumps to operate unnecessarily without this pressurized reserve of water.    
Read More

ASME Hydropneumatic Tanks Play An Important Role in Pressure Booster Systems

 “Do I really need a hydro-pneumatic tank on my variable speed pressure booster?”

 It’s a question many engineers will ask, particularly after ASHRAE 90.1 – 2010 takes effect in commercial building codes as early as October of this year.  As we discussed in an earlier blog on variable speed pressure boosting, the new ASHRAE standard no longer permits pressure reducing devices to reduce the pressure of water supplied by booster system pumps.  This essentially puts an end to constant speed pressure boosting, which brings variable speed to the forefront.  But since the whole point of variable speed pumping is to more accurately align demand with supply, why would hydro-pneumatic tank still be required?

Read More

Flow Balance Valve Location: Supply or Return Side of the Coil

Most agree (including those of us at JMP) that flow balancing valves should be placed on the return side of coils whenever possible. Why? Because this location helps reduce air and noise problems within the system.

Read More

ASHRAE Pipe Sizing Requirements Are Changing – System Syzer Makes It Easy!

Bell & Gossett’s System Syzer does all the piping calculations necessary to meet ASHRAE 90.1 and 189.1 requirements. JMP is committed to getting all our customers up-to-speed on ASHRAE 90.1 – 2010. We’ve already covered some of these topics in previous blogs, including changes to pressure booster design.  Today’s blog focuses on the portions of 90.1 - 2010 that dramatically impact the selection of pumps and associated piping.

Read More