Steam Basics Part 13: Control Schemes for Steam Condensate Lift

By Chad Edmondson (JMP) and Norman Hall (RLD)

Over the last few weeks we have discussed how to size a steam trap for a heat exchanger or coil with a modulating control valve. This week we turn our attention to the heat exchanger or coil piping after the steam trap. 

Steam Condensate Lift using an On-Off Control Scheme

Often, the gravity condensate return main is installed overhead and there is a temptation to lift the condensate out of the trap. 

The back pressure created by lift is approximately 1 PSIG for every 2 feet of condensate lift. The actual number is 2.31 feet per pound, but 2 feet includes some safety factor and allowance for friction loss. If a unit heater with no control valve had 8 PSIG of pressure entering the steam trap, and it was sized at full pounds per hour (PPH) capacity with a 2 PSIG pressure differential, the steam trap outlet pressure is 6 PSIG. This is enough pressure to lift the condensate 12 feet to a gravity return main. If there was an on-off control valve on the terminal unit, there would still be a constant minimum pressure available on the outlet of the steam trap for lift. The problems begin when we throttle a steam control valve.

Steam Condensate Lift in a Modulating Control Scheme is Asking for Trouble

The story is different when there is a modulating control valve on the coil or heat exchanger. The pressure available to the steam trap is only the elevation of the condensate outlet pipe from the coil or heat exchanger.  There are who will argue that a check valve on the discharge of the trap would prevent condensate from backing up into the heat exchanger.  This argument does not "hold water" but it does "hold condensate." (Sorry for the pun - couldn't resist!)

If we use the 12-foot lift example from above, when the control valve is closed and the steam flow has stopped, there is a column of water on the outlet of the check valve. That 12-foot column would require about 6 PSIG of inlet pressure to push the check valve open and start flow. Meanwhile, condensate is backing up into the heat exchanger or coil.

Flooded-heat-exchanger-shell.jpg

Another argument we often hear centers around load. Some argue that the load is reduced when the control valve is throttled which gives more pressure to lift.  This argument is similar to playing roulette. Once in a while you may win, but if you lose, the cost is non-warranty damage to a heat exchanger bundle. A pretty high price to pay for gambling!

A simple scenario where you lose the bet is the startup load.  Seasoned steam plant operators know that when the steam system is first started up in the fall, steam pressure does not build up until the piping and equipment are up to saturation temperature. All the steam entering the pipe is immediately condensed as the pipe heats up. If your system has a 12” diameter shell and tube heat exchanger at 5 feet long, it will take about 5 pounds of steam to heat it up. This does not include any piping, the bundle, or the water.  Five pounds is a little over half a gallon of condensate, which is twice the volume of the 14” with a 2” condensate pipe before the trap. In this case, you lose the bet. Condensate will back up into the heat exchanger.

If we only have 14” or ½ PSIG at the inlet to the trap and we need the ½ PSIG to pass the condensate out of the trap, there is no pressure available for lift. Condensate will back up into the heat exchanger or coil and steam hammer will destroy the coil. (Never lift out of a heat exchanger or coil with a modulating control valve. Run the condensate to a gravity drain without lift or add a condensate pumping unit.)