What is Legionella and Why Should You Care?

Legionella. It is a potentially fatal bacterium that for the most part has managed to fly under the radar of the general public since it was first determined as the cause of Legionnaires’ disease in the 1970s. Despite the fact that there are well-known techniques to prevent the growth of the causative bacteria, legionellosis (commonly known as Legionnaires’ disease) has taken the lives of well over 100,000 people in the U.S. alone. Furthermore, reported cases of the bacteria has risen 217 percent in just the last decade, according to the Centers for Disease Control and Prevention.
Read More

No More Constant Speed Pressure Boosting Under ASHRAE 90.1 - 2010

By Mark Bingham

“Constant speed pressure boosters are DEAD and GONE TO HEAVEN!”

That was the prevailing message recently from Chris Edmondson, CEO of JMP, as he briefed the folks here at about the upcoming mandatory changes under SECTION 10.4 of the new ASHRAE 90.1 – 2010.

Read More

Federal Buildings To Comply with ASHRAE 90.1-2010 – Just Like the Rest of Us!

By Chad Edmondson

It’s only a matter of weeks before new commercial buildings codes must comply (or state’s must a request for extension) with ASHRAE 90.1 -2010, as we reported in an earlier blog.  And it looks like federal buildings will also have to follow suit too – albeit a little later

Read More

Designing Waterside Economizer Piping to Meet ASHRAE 90.1 - 2010

By Chris Edmondson 

Gone are the days of optional air or waterside economizing.  Gone also are the days of waterside economizers piped in parallel.  In other words, the “either/or” operation of the chillers and economizers that we’re all accustomed to will soon be a thing of the past.

Read More

ASHRAE Pipe Sizing Requirements Are Changing – System Syzer Makes It Easy!

Bell & Gossett’s System Syzer does all the piping calculations necessary to meet ASHRAE 90.1 and 189.1 requirements. JMP is committed to getting all our customers up-to-speed on ASHRAE 90.1 – 2010. We’ve already covered some of these topics in previous blogs, including changes to pressure booster design.  Today’s blog focuses on the portions of 90.1 - 2010 that dramatically impact the selection of pumps and associated piping.

Read More