How To Develop Cooling Tower Life Cycle Cost Analysis: Defining Dry Bulb, Wet Bulb, and Approach

How To Develop Cooling Tower Life Cycle Cost Analysis: Defining Dry Bulb, Wet Bulb, and Approach

In our last blog we suggested incorporating IPLV (Integrated Part Load Values) into your cooling tower lifecycle cost analysis. Next, we need to fill in wet bulb temperatures that correspond with the part load conditions we’ve identified and already added to our lifecycle worksheet. …

Read More

How To Develop Cooling Tower Life Cycle Cost Analysis: Filling In The Blanks

How To Develop Cooling Tower Life Cycle Cost Analysis:  Filling In The Blanks

It is important that engineers be able to compare cooling towers (brands and configurations) in terms of both equipment and life cycle cost.  Just as important, that comparison needs to be based on realistic operating parameters.  At JMP we’ve developed a method that lets engineers…

Read More